PROBLEM: PacWave South is pre-permitted — developers can test there without acquiring their own permits — and it operates under a 25-year FERC license, but the permitting path for marine energy elsewhere still runs through years of separate approvals, with no standard record of what was permitted, by whom, and for how long.
SOLUTION: A marine energy permitting record: the site, the permits held, the issuing authority, the term, and the conditions — one record per site, so a pre-permitted test bed and a fully permitted commercial site can be compared on the same terms.
EVIDENCE BASIS: DOCUMENTED — PacWave South is pre-permitted and operates under a comprehensive 25-year FERC operating license; it can host up to 20 wave energy converters at once. Sources: research note energy-grid-wave-breakthroughs-20261120.md (F9). The combined wave-energy system is inventor CONCEPT ONLY.
| Idea priority | Low |
| Needed By | Not sure -- Just thought it was cool |
By clicking the "Post Comment" or "Submit Idea" button, you are agreeing to the IBM Ideas Portal Terms of Use.
Do not place IBM confidential, company confidential, or personal information into any field.