PROBLEM: 6G entered its formal study phase: 3GPP TR 22.870 (Stage-1 6G use cases and service requirements) was approved at TSG SA#111 in Fukuoka, March 2026; TR 38.914 was ~60% complete in March 2026 and approved at the June 2026 plenary; the Release 21 normative timeline was agreed in June 2026, with Stage-3 freeze December 2028 and commercial 6G generally expected ~2030. There is no register tracking which 6G study items (AI-native radio, integrated sensing and communication, non-terrestrial networks) are approved, pending, or dropped.
SOLUTION: A 6G study-phase requirements register: every approved 6G study item logged with its TR number, approval date, and normative timeline — so the standards process is tracked as it happens, not reconstructed after the freeze.
EVIDENCE BASIS: DOCUMENTED — 3GPP TR 22.870 approved Mar 2026; TR 38.914 approved June 2026 plenary; Release 21 timeline agreed June 2026 (Stage-3 freeze Dec 2028, ASN.1/OpenAPI freeze Mar 2029); corroborated by 3GPP 6G Tracker and arXiv review of the June 2026 plenary. IEEE PIMRC 2025 AI-driven RIS beam-selection work is peer-reviewed conference work (simulation/testbed scale).
| Idea priority | Low |
| Needed By | Not sure -- Just thought it was cool |
By clicking the "Post Comment" or "Submit Idea" button, you are agreeing to the IBM Ideas Portal Terms of Use.
Do not place IBM confidential, company confidential, or personal information into any field.